2.  The Footings and bottom drains and necessary pipe work are laid



This Winter we have extended our premises and have a new extension with 3 large fibreglass purpose built tanks.



 

 

 

 

 

1.  24 tonnes of soil was excavated and removed to create an overall
depth of 1.8 metres.

3. The walls of the tanks start to take shape












4. The Tank walls continue to grow



5. How deep do they need to be?


6. A separate Sump tank has been built for the filter system













7. The tanks are given a smooth render coat to a very high finish ready for fibre glassing


8. Next the building structure and roof had to be erected to allow the render time to dry and keep it dry for fibre glassing

9. The sooner its built the better the sky looks like more rain!!











12. Tank completed with the top coat of fibre glass
























13. The finished shop extension with fibre glass tanks






15. The other shop room





































14. The finished shop extension with fibre glass tanks




10.  The roof is on, the sides are covered and the double glazed windows are in.



11. Inside view with the glazing done and the fibreglassing without the top coat.







Come and vist and see the new facilities - Spring Ogata Koi now in stock

              HomeAbout UsProductsContact UsEnquiriesDeliveryPrivacy PolicySpring Koi 2011
The final set of tanks are fitted - this involved taking doors and windows out in order to get the fibre Glass tanks manouvered into position!!